Water well design
The intended use, planned water demand, site and available hydrogeological data are assessed during water well design. The required technical solutions are prepared according to the conditions of the specific property.
DESIGN
A properly prepared design helps ensure that a water well or geothermal heating system meets the technical conditions and intended use of the specific property. MELKERLITA helps assess the initial information, prepare technical solutions and determine which documents and approval procedures are required before installation begins.
Request a consultationDocuments and requirements
The required documents depend on the planned well or geothermal system type, property location, land ownership and applicable legal requirements. Separate design rules apply to groundwater abstraction wells and geothermal boreholes in Lithuania.
Under the procedure approved by Lithuanian Environment Minister Order No. 417, a groundwater abstraction well design is prepared for newly designed abstraction wells, including exploratory wells. The precise project content is determined under the current procedure, not solely by this indicative list.
Order No. D1-273 applies to all geothermal energy boreholes regardless of installed capacity. Designs for systems above 50 kW nominal capacity or boreholes planned in groundwater protection zones are coordinated with the Lithuanian Geological Survey under paragraph 14.2. Other approvals may also be required because of construction or special land-use conditions. Where abstracted groundwater is used for geothermal energy, the relevant groundwater well rules apply.
Next steps
Once the design is complete, the required approvals are obtained and registration procedures apply after the well has been installed. A groundwater abstraction well must be registered in the Register of the Earth’s Interior and have a well passport before it is used.
A separate registration and system passport procedure applies to geothermal borehole systems.
Well design, installation, registration and a permit to use groundwater resources are separate procedures. Whether a permit is required depends on the purpose and amount of water use and other circumstances defined by law.
Benefits of design
Properly prepared technical solutions make it possible to assess site conditions in advance, coordinate different system elements and define the expected scope of work more clearly. This helps reduce the risk of technical inconsistencies and unforeseen changes during installation.
Technical solutions are prepared from property data and planned requirements.
Design identifies the required work, equipment and principal technical parameters.
The compatibility of the water well or geothermal collector with other engineering-system elements is assessed.
How we work
We discuss the requirements, purpose of the property and available documents.
We assess the technical, geological or hydrogeological conditions according to the project type.
We prepare technical solutions appropriate to the scope of the design.
We deliver the documentation and explain the proposed solutions.
Design cost depends on the complexity of the property, required initial information and investigations, scope of technical solutions and approval procedures. The exact cost and schedule are determined after assessing the requirements of the specific project.